Contact Details
Estimated install date
Please choose dates0-6 months6-12 months12+ monthsOther
Project Details
Is your project?New BuildNew Build and RenovationMajor conversionRenovationOther
What stage have you reached?ResearchPlanning applied forBuild startedPlanning obtainedRoof onBuilding regs obtainedOther
What floor construction are you using?
Basement
SolidJoisted
Ground floor
First floor
Second floor
Insulation details — New build
Double glazingTriple Glazing
Insulation details — Renovation
Glazing
SingleSecondaryDoubleTriple
Walls
None30mm50mm75mm100mmCavity filledInternalExternalAssumed
Floor
None30mm50mm75mm100mmAssumed
Loft
None100mm200mm300mmAssumed
Heat source? (tick all required)
If ground source, a full ground survey must be completed by an externally approved company.
Ground source heat pump boreholeGround source heat pump ground loopAir source heat pumpOil boilerGas boilerOther
Install options
Self installOwn installerRegistered installer
Upload project plans
I agree to my data being stored and used to receive the latest news, promotions and offers.